Railway networks - Urban mass transit

Lynxeo delivers railway signaling cables to Alstom for BSA project, Egypt

23 jun 2020

  • Lynxeo has delivered 1,700 km of a special signaling cable developed by its Tuzla plant in Turkey to be free of petroleum gel while ensuring a high level of water resistance and flame retardance.

Paris, La Défense, June 23, 2020 – Lynxeo has completed the delivery of 1,700 km of specialized signaling cable to Alstom for the BSA (Beni Suef – Asyut) project in Egypt. The specialized cable was developed and manufactured by the Lynxeo plant in Tuzla, Turkey – a Group manufacturing base for railway signaling cables.

“ We selected Lynxeo for our BSA project based on its capacity to handle complex projects and capability to meet our requirements regarding special features that meet ENR expectations. That is why we recognize Lynxeo as a trusted supplier ”

Mohamed Khalil

Alstom Egypt Managing Director.

The BSA project was initiated by the Egyptian Ministry of Transport as part of the national investment in the area parallel to the River Nile south of Cairo, the capital city. This railway is one of the top three main lines in Egypt and is an important connection between the cities of Beni Suef and Asyut, with 250 km of lines, The target was to modernize signaling systems on the ENR (Egyptian National Railways) network to ensure passenger safety while increasing the number of trains in circulation by more than 80 percent.

Lynxeo Tuzla carried out a special cable development project to meet the specific technical requirements of Alstom and Egyptian National Railways. The result was a specialized, cost-effective cable design that offers water resistance without using a petroleum gel filler as well as the flame retardant properties which ensure the safety, crucial for this railway application.The other factors key to Lynxeo’s success in winning the BSA contract were the high level of technical support and deep experience in railway signaling projects offered by theTuzla factory team.

“ The success of the BSA project confirms that our long-standing understanding of high-quality production and service relates not only to our reliability in cable production and testing, but also to our ability to act in line with customer needs at all stages as well as the strength of our global team. ”

Kamil Mutlu

Lynxeo Turkey R&D and Engineering Director

Tu contacto

Press Contact

Nexans communications

Industry Solutions & Projects Business

Market information

Contáctanos

Temas sobre los que desea recibir mayor información

Campos requeridos

Por favor revise la data ingresada e intente nuevamente

El correo debe contener este símbolo @

Protección de data personal

Tiene el derecho de rechazar el procesamiento de sus datos personales y/o su uso para propósitos comerciales

¡Gracias!

Gracias por contactarse con nosotros. Nos pondremos en contacto pronto.

Error

Ocurrió un error. Por favor intentar nuevamente

Cerrar