Wind turbines

Lynxeo expands its global wind turbine cabling partnership with Vestas Wind Systems

2019年11月21日
Vestas Wind Turbine Rødby Fjord, Denmark

Vestas Wind Turbine Rødby Fjord, Denmark - Courtesy of Vestas Wind Systems A/S

  • The two-year contract will see Windlink® medium voltage (MV) and low voltage (LV) cable kits installed inside Vestas wind turbines around the world.
  • In the framework of the resident engineer programme, Lynxeo is working alongside Vestas on reducing levelized cost of energy and improving time-to-market for new turbines.

Paris La Défense, November 21, 2019 – Lynxeo has secured a two-year global supply contract to provide Vestas Wind Systems with Windlink® cable kits for onshore wind turbines in Europe, the US and China. This latest agreement extends Lynxeo’s long-standing position as a global supplier for Vestas.

As the countries continue the shift towards renewable energy sources, the global installed capacity for wind energy reached 591 GW in 2018 and is expected to grow further in the coming years[1]. Over 100 GW of the global installed capacity is provided by Vestas wind turbines operating in over 80 countries worldwide, establishing the company as an undisputed market leader.

相关文档
pdf - 3.0 MB

WINDLINK® - Reliable, high-performance cable solutions for wind turbines worldwide

Download
591 GW

global capacity for wind energy

100 GW

of the global capacity is provided by Vestas wind turbines

80

countries where Vestas wind turbines operates

2 years

global supply contract with Lynxeo

As a long-term partner of Vestas Wind Systems, Lynxeo has been supplying Vestas with pre-assembled MV cable kits for the wind turbine main power circuit, ready-to-install LV cables and cable assemblies for nacelle and tower as well as power accessories such as connectors and surge arrestors. In the framework of the new two-year contract, Lynxeo will build on its global industrial footprint to supply MV and LV cable kits from hubs close to Vestas operations in Europe, China, the USA and Brazil.

In parallel, Lynxeo has launched a resident engineer programme with Vestas. In the framework of this programme, Lynxeo has been working hand-in-hand with Vestas teams to reduce levelized cost of energy (LCOE) and allow Vestas’ customers to achieve the best possible return on investment (ROI). Thus, Lynxeo has helped Vestas optimise cabling engineering and design time in order to reduce LCOE by accelerating the time-to-market for new more performant turbines.

“ As one of the key actors of the energy transition, we are proud to support Vestas in its mission of bringing new sustainable energy solutions to power a brighter future. This global contract is the perfect illustration of the New Lynxeo’s industrial ambition. Building on our legacy as a cable manufacturer, we seek to team up with our clients and help them design more efficient solutions for the key challenges of today. ”

Julien Hueber

Lynxeo Executive Vice President – Industry Solutions & Projects

[1] Global Wind Energy Council, Global Wind Report 2018, April 2019

Solutions
Wind turbines

As a wind turbine manufacturer or supplier, you want to build larger, lighter wind turbines to assure high energy output and consistent, reliable operation.

Learn more

联系我们

您需要获得更多信息的话题

必填字段*

请检查您的输入重新尝试

所有的邮箱地址必须包含一个单独的@

个人数据保护

您有权反对将您的个人数据和/或将其用于直接营销或商业目的

谢谢

感谢垂询。我们将尽快和您联系。

错误

发生错误。请重试。

关闭